The
following descriptions of the typical phases of Architectural Services
are excerpts from "The Architect's Handbook of Professional Services",
twelfth edition, published by the American Institute of Architects. These
are provided for the reference and convenience of our potential clients.
CONTRACTUAL
FRAMEWORK*
(Back to top)
Design is undertaken
within a contractual framework that
This contractual
framework is established in the agreement between owner and architect.
Design activities may be described in detail or, in the case of small
or mimited scope projects, in a few sentences. AIA Document B141, the
most commonly used form of owner-architect agreement, establishes five
project phases:
SCHEMATIC
DESIGN*
(Back to top)
Schematic Design
establishes the general scope, conceptual design, and scale and relationships
among the components of the project. The primary objective is to arrive
at a clearly defined, feasible concept and to present it in a form that
achieves client understanding and acceptance. The secondary objectives
are to clarify the project program, explore the most promising alternative
design solutions, and provide a reasonable basis for analyzing the cost
of the project.
DESIGN
DEVELOPMENT*
(Back to top)
Design development
is the period in which the design itself achieves the refinement and
coordination necessary for a really polished work of architecture. The
decisions made in schematic design are worked out at a scale that minimizes
the possibility of major modifications during the construction contract
documents phase. Working drawings and specifications are complex and
intricately interrelated; changes in those documents are costly and
more likely to lead to coordination problems during construction. Thus,
the primary purpose of design development is to further define and describe
all important aspects of the project so that what remains is the formal
documentation step of construction contract documents.
Design development
may be a substantial undertaking, or it may be a much briefer transition
from schematic design to construction documents. Some owners require
extensive schematic design services; with much of the project "developed"
by the time this phase ends. For some straightforward or repetitive
projects, the schematic design may be sufficiently clear for both owner
and architect to proceed directly to construction documents with confidence.
In there instances, design development may be brief (or in the most
extreme cases, nonexistent).
CONSTRUCTION
DOCUMENTS*
(Back to top)
During the construction
documents phase, additional design issues emerge as the design team
works out the final material and system selections, details, and dimensions.
For example,
The final detailing
and specification of an exterior wall, including the selection of specific
products and manufacturers, inevitably leads to modifications of the
dimensions, color, transparency, and other aspects of the wall.
The detailing and specification of interior partitions, openings, and
finishes involves a large number of minute design decisions from the
location of joints to the selection of the final materials or acceptable
alternates.
BIDDING
AND NEGOTIATION*
(Back to top)
The bidding and
negotiation phase is usually a short but very important part of the
project delivery process. To this point, the project team has invested
an enormous amount of time, talent, and energy in designing and documenting
a project that meets the owner's requirements. During bidding and negotiation,
the building industry provides its response - its statement of what
it can do, how much time it will take to do it, and what price it will
charge.
The "moment-of-truth"
character of bidding and negotiation is well known. At this point, some
projects are sent back to the drawing board; a few are terminated entirely.
Just as important, though, bidding and negotiation bring the builder
or builders to the project team. A new set of formal and informal relationships
must be forged and these relationships will have much to do with the
success of the project.
The services
provided by the architect during bidding and negotiation are very important.
They play an essential part in attracting the best possible builders
to the project, obtaining reasonable prices, and starting the construction
process off on the best possible foot.
CONSTRUCTION
CONTRACT ADMINISTRATION*
(Back
to top)
As construction
contract administrators, architects interpret the documents, track the
progress of the work, and reconcile the sometimes competing interests
of the owner and those constructing the project.
The construction phase brings all the predesign, design, documentation,
bidding, and negotiation services to realization. While one or more
building contractors assume responsibility for the construction work,
architects remain involved to
- Observe the
construction work for conformance to drawings and specifications
- Process the
contractor's shop drawings, product data and samples
- Review the
results of construction tests and inspections
- Evaluate contractor
requests for payment
- Handle requests
for changes during construction
- Address and
resolve claims brought by the owner or contractor
- Administer
the completion and closeout process for the owner
*
- Content courtesy of The Architect's
Handbook of Professional Practice, 12th edition
published
by the American Institute of Architects
|